Close Menu
xpertsstudio

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    David Schwartz Says XRP Ledger Stayed Online During a Network

    September 9, 2026

    a16z Crypto Provides Insight on the CLARITY Act, Key Points

    September 9, 2026

    Ripple’s Veteran Schwartz Discloses Private XRP Ledger Hub Health After Network

    September 9, 2026
    Facebook Instagram YouTube WhatsApp TikTok Telegram
    xpertsstudio
    Facebook Instagram YouTube WhatsApp TikTok Telegram
    • Home
    • DeFi News
    • Altcoin News
    • Bitcoin News
    • Ethereum News
    • Crypto Business
    • More
      • Blockchain & Web3
      • Crypto Regulation
      • Crypto Markets
    xpertsstudio
    Home»Bitcoin News»Construction continues at a data center campus with $6.6B in contracted revenue
    September 8, 20260 Views

    Construction continues at a data center campus with $6.6B in contracted revenue

    EditorBy EditorSeptember 8, 2026No Comments8 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email Copy Link
    Follow Us
    Google News Flipboard
    Construction continues at a data center campus with $6.6B in contracted revenue
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Don't want to trade it yourself?

    Our desk runs DEX portfolios on profit share.

    35% Share
    $2.5K Minimum
    Learn more

    CleanSpark Releases August 2026 Operational Update

    August data show CleanSpark’s growing hashrate, contracted power and <a href="https://xpertsstudio.com/bitcoin-braces-for-cpi-as-oil-nears-100-and-etf-inflows-hit-3-8-billion/” title=”Bitcoin Braces For CPI as Oil Nears $100 and ETF Inflows Hit $3.8 Billion”>bitcoin sales alongside $6.6 billion in contracted revenue at its Sandersville campus.

    Rhea-AI Impact
    (Moderate)
    Rhea-AI Sentiment
    (Very Positive)
    Tags

    Rhea-AI Summary

    CleanSpark (CLSK) reported its unaudited Bitcoin mining and operations update for August 2026 and progress on its Sandersville and Texas projects.

    Construction continues at the Sandersville campus, which is tied to $6.6 billion in contracted revenue. In Texas, the company received conditional ERCOT classification for 585 MW of contracted capacity to receive batch zero baseload designation and 300 MW for batch zero studied load designation.

    In August, CleanSpark produced 593 bitcoin, averaging 19.12 bitcoin per day, with calendar 2026 production at 4,903 bitcoin. Operational hashrate reached 50 EH/s, with an average of 38.3 EH/s and peak fleet efficiency of 16.07 J/Th, supported by 808 MW utilized from 1.8 GW under contract. Bitcoin holdings were 13,703 as of August 31, after sales at an average price of $65,420 per bitcoin.

    Loading…
    Loading translation…

    Positive

    • $6.6 billion in contracted revenue tied to the Sandersville campus construction
    • ERCOT conditional classification for 585 MW baseload and 300 MW studied load in Texas
    • August bitcoin production of 593 BTC at an average of 19.12 BTC/day
    • Operational hashrate peak of 50 EH/s with 16.07 J/Th peak efficiency
    • Power portfolio of 1.8 GW under contract with 808 MW utilized
    • Bitcoin holdings of 13,703 BTC as of August 31, 2026
    • Average realized price on August bitcoin sales of $65,420 per bitcoin

    Negative

    • None.

    The update makes clear that part of reported bitcoin holdings is tied to derivatives, while sales are separated by transaction type.

    CleanSpark’s unaudited August report adds transaction detail to the month-end treasury position: holdings declined from July 31, 2026
    to August 31, 2026
    , with separate disclosures for bitcoin sold at spot, pursuant to call exercises, and in connection with a delta-neutral basis trade.

    The report also states that 3,951 bitcoin of the 13,703 bitcoin held at August 31, 2026
    was posted as collateral or recorded as receivable, all related to derivative transactions.

    The Aug 05, 2026 operational update was followed by a -4.73% 24-hour reaction; that comparable mining-and-infrastructure release contextualized this August update, whose market data was pre-publication.

    Contracted revenue
    $6.6 billion
    Sandersville campus
    Bitcoin produced
    593 BTC
    August 2026
    Operational hashrate
    50 EH/s
    August 31, 2026
    Power under contract
    1.8 GW
    August 2026
    Utilized power
    808 MW
    August 2026
    Bitcoin holdings
    13,703 BTC
    As of August 31, 2026
    Conditional batch zero baseload capacity
    585 MW
    ERCOT classification
    Conditional batch zero studied load capacity
    300 MW
    ERCOT classification

    1. Aug 05

      Operational update

      24h Move
      -4.7%

      Reported 586 BTC production and continued the $6.6 billion Sandersville lease program.

    2. Jul 14

      Lease announcement

      24h Move
      +8.8%

      Announced a 20-year Sandersville lease with $6.6 billion initial contracted revenue.

    3. Jun 07

      Operational update

      24h Move
      -7.6%

      Reported 614 BTC production, 50 EH/s peak hashrate, and 1.8 GW contracted power.

    24h Move is the share-price change in the day after each event; other market factors may also have contributed.

    operational hashratetechnical
    “Operational Hashrate1 | 50 EH/s”
    Operational hashrate is the actual computing power that a cryptocurrency mining operation is producing at a given time, measured by how many cryptographic problems it can solve per second. Think of it as the number of machines in a factory that are actually running versus the total that could be installed; higher operational hashrate means greater potential for mining rewards and revenue, while drops can signal equipment failures, maintenance, or rising costs that matter to investors.
    delta neutral basis tradefinancial
    “Bitcoin sold related to delta neutral basis trade | (244)”
    A delta neutral basis trade is a market strategy that seeks to profit from the price gap between a security’s current market price and a related derivative (like a futures or forward) while neutralizing exposure to overall market moves. Think of it as balancing a scale so gains from the price gap can be collected without betting on whether the market goes up or down; it matters to investors because it can offer returns with reduced directional risk, though it still carries costs and specific risks tied to timing, funding and the relationship between the instruments.

    AI-generated analysis. How Rhea-AI works. Not financial advice.

    See more from StockTitan in Google Search and AI answers.Adds StockTitan as a preferred

    Construction ongoing for the Sandersville campus with $6.6 billion
    in contracted revenue

    Receives notice of conditional batch zero classification by ERCOT for both sites in Texas

    LAS VEGAS, Sept. 8, 2026 /PRNewswire/ — CleanSpark, Inc. (Nasdaq: CLSK) (“CleanSpark” or the “Company”), a market-leading data center developer, today released its unaudited Bitcoin mining and operations update for the month ended August 31, 2026.

    “We continue making strong construction progress at our Sandersville site as we execute for our high-investment grade tenant,” said CEO and Chairman Matt Schultz. “In Texas, we support and remain fully committed to satisfying Governor Abbott’s audit directive with both ERCOT and the PUCT.  As part of that process, we have received notice of conditional classification by ERCOT for 585 MW of contracted capacity to receive batch zero baseload designation and 300 MW to receive batch zero studied load designation, as expected. We look forward to working collaboratively with all stakeholders to serve the needs of Texans while also delivering for our shareholders and customers.”

    August 2026 Bitcoin Mining Highlights (Unaudited)

    Peak single day bitcoin production

    Average daily bitcoin production

    Peak efficiency of deployed fleet

    Deployed fleet as of August 31

    Total bitcoin holdings as of July 31

    Bitcoin sold pursuant to call exercises

    Bitcoin sold related to delta neutral basis trade

    Total bitcoin holdings as of August 314

    Average price per bitcoin sold5

    1Operational Hashrate refers to the highest hashrate historically achieved concurrently by all installed and functional miners that were: properly racked and configured, supported by energized infrastructure, and capable of actively contributing to our mining pool or directly to the Bitcoin network.

    2GW under contract includes all contracted power capacity for wholly owned or leased sites and excludes any other non-binding arrangements.  

    3Utilized MW represents the maximum megawatts used concurrently in support of the fleet’s Operational Hashrate.

    4As of August 31, 2026, CleanSpark’s Bitcoin holdings were 13,703 in total, of which 3,951 was posted as collateral or as receivable and all related to derivative transactions.

    5Average price calculated as net proceeds from bitcoin sold plus net premiums generated divided by total bitcoin sold.

    About CleanSpark
    CleanSpark (Nasdaq: CLSK), is a market-leading data center developer with a proven track record of success. We control a portfolio of more than 1.8 GW of power, land, and data centers across the United States powered by globally competitive energy prices. Sitting at the intersection of Bitcoin, energy, operational excellence, and capital stewardship, we optimize our infrastructure to deliver superior returns to our shareholders. Monetizing low-cost, high reliability energy by producing a global emerging critical resource – compute – positions us to prosper in an ever-changing world. 

    Forward-Looking Statements
    This press release contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. In this press release, forward-looking statements include, but may not be limited to, statements regarding the Company’s expectations, beliefs, plans, intentions, and strategies. In some cases, you can identify forward-looking statements by terms such as “may,” “will,” “should,” “expects,” “plans,” “anticipates,” “could,” “intends,” “targets,” “projects,” “contemplates,” “believes,” “estimates,” “forecasts,” “predicts,” “potential” or “continue” or the negative of these terms or other similar expressions. The forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other important factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements, including, but not limited to: scaling towards becoming a multi-gigawatt AI and digital infrastructure platform; the success and performance of the Company’s non-bitcoin data center activities and expansion into non-bitcoin infrastructure;  completion of construction, regulatory approvals, and electrical power availability to achieve anticipated growth; the success and performance of the digital asset management and derivatives trading activities; the success of our digital currency mining activities; bitcoin volatility; the dependency on utility rate structures and government incentive programs;  and other risks described in the Company’s prior press releases and in its filings with the Securities and Exchange Commission (SEC), including under the heading “Risk Factors” in those filings. Forward-looking statements contained herein are made only as to the date of this press release, and we assume no obligation to update or revise any forward-looking statements as a result of any new information, changed circumstances or future events or otherwise, except as required by applicable law.  

    Investor Relations Contact  
    Harry Sudock
    702-989-7693
    ir@cleanspark.com 

    Media Contact 
    Eleni Stylianou
    702-989-7694
    pr@cleanspark.com

    View original content to download multimedia:https://www.prnewswire.com/news-releases/cleanspark-releases-august-2026-operational-update-302872772.html

    What was CleanSpark’s cumulative bitcoin production in calendar year 2026 through August?

    CleanSpark’s cumulative bitcoin production for calendar year 2026 through August 31 was 4,903 bitcoin.

    How many miners were deployed in CleanSpark’s fleet at the end of August 2026?

    The deployed fleet totaled 201,269 miners as of August 31, 2026.

    What were the key components of CleanSpark’s bitcoin treasury activity in August 2026?

    CleanSpark began August with 13,931 bitcoin, produced 593 bitcoin, and sold 77 bitcoin at spot, 500 bitcoin pursuant to call exercises, and 244 bitcoin related to a delta neutral basis trade, ending the month with 13,703 bitcoin.

    Source: www.stocktitan.net

    Partner offer

    Start trading on Bybit

    Deep derivatives liquidity, tight spreads, and a deposit bonus on your first funding.

    Claim bonus
    campus Center Construction continues Data
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    K
    Mentioned in this article

    KuCoin

    Spot, futures and trading bots in one account. Our link applies a fee discount at signup.

    Open account

    Related Posts

    Bitcoin’s Bullish Structure Faces Final Test at $83,000 as Spot Demand Lags

    September 8, 2026

    Strive Buys 1,375 More Bitcoin, Nears $1 Billion SATA Balance Milestone

    September 8, 2026

    Bitcoin remains highly sensitive to macro signals amid changing derivatives narrative

    September 8, 2026
    Leave A Reply Cancel Reply

    Accepting new clients

    Portfolio Management

    Managed trading on centralised and decentralised markets, handled by our experienced trading desk.

    Professional crypto trading management
    Profit share 35%
    Min. capital $2,500
    Wallet Set up by us
    Execution Full service
    How the service works
    • New to on-chain trading? Our team runs it for you on a profit-sharing basis.
    • We create the wallet and place every trade — no DEX experience needed on your side.
    • The share is 35% of profit on each token traded.
    • Minimum starting capital is $2,500.
    Start DEX Management
    Profit share 00%
    Min. capital $0,000
    Custody Your account
    Execution Full service
    How the service works
    • Your funds remain in your own exchange account while our team manages the trading activity.
    • You maintain control of your account and funds throughout the management period.
    • We provide professional trading management based on the agreed strategy and terms.
    • Works with KuCoin, MEXC, Bybit and Phemex.
    • Receive a monthly report covering positions, trading activity and performance.
    CEX management terms, profit split and minimum capital are agreed in writing before onboarding.
    Apply for CEX Management

    Not financial advice. Crypto trading involves substantial risk and past results do not guarantee future returns. Capital can be lost in full. Full terms are agreed in writing before onboarding.

    Trusted Exchanges

    5

    Open an account through our partner links to claim fee discounts and sign-up bonuses.

    K KuCoin Spot & futures · trading fee discount M MEXC Widest altcoin listings · low maker fees B Blofin Copy trading · no-KYC onboarding Y Bybit Deep derivatives liquidity · deposit bonus P Phemex Contract trading · zero-fee spot plan

    Affiliate disclosure: We may earn a commission when you sign up through these links, at no extra cost to you. Trading carries risk — never invest more than you can afford to lose.

    Top Posts

    XRP Price to $0.18? Analysts Warn of Drop as Brad Garlinghouse Bets on Ripple’s Crypto Winter

    August 19, 20264 Views

    XRP Branding Hits Florida Field in Reported $5M Annual Ripple Deal

    September 5, 20263 Views

    Watch Out: Massive Token Unlocks Are Coming for 14 Altcoins This Week—Here’s the Day-by-Day, Hour-by

    September 7, 20262 Views
    0% Spot fees

    Phemex zero-fee spot plan

    Sign up with our referral code to activate the plan on a new account.

    CODE · E4G2K
    Redeem
    Most Popular

    XRP Price to $0.18? Analysts Warn of Drop as Brad Garlinghouse Bets on Ripple’s Crypto Winter

    August 19, 20264 Views

    XRP Branding Hits Florida Field in Reported $5M Annual Ripple Deal

    September 5, 20263 Views

    Watch Out: Massive Token Unlocks Are Coming for 14 Altcoins This Week—Here’s the Day-by-Day, Hour-by

    September 7, 20262 Views
    Our Picks

    David Schwartz Says XRP Ledger Stayed Online During a Network

    September 9, 2026

    a16z Crypto Provides Insight on the CLARITY Act, Key Points

    September 9, 2026

    Ripple’s Veteran Schwartz Discloses Private XRP Ledger Hub Health After Network

    September 9, 2026

    Stay Ahead of Crypto

    Get the latest crypto, blockchain, and Web3 news delivered straight to your inbox.

    Facebook Instagram YouTube WhatsApp TikTok Telegram
    • About Us
    • Contact us
    • Disclaimer
    • Privacy Policy
    • Terms & Conditions
    © 2026 Xperts Studio. Develop by Pro

    Type above and press Enter to search. Press Esc to cancel.